Calculate project revenue for unit price contracts based on installed tonnage, area, and contract rates.
The calculation prioritizes actual tonnage for unit price contract billing:
For a project paving 1000 ft by 24 ft at a 3-inch thickness with a unit price of $125/ton and 5% retainage. The area is 24,000 sq ft, yielding an estimated tonnage of 440 tons. Gross Revenue is 440 × $125 = $55,000. After a 5% discount ($2,750), the final Net Sales are $52,250. If you later input an actual installed tonnage of 445 tons, the calculation updates to use that value for billing.
The Asphalt Business Revenue Calculator is a precision tool specifically engineered for asphalt paving contractors operating under unit price contracts. Common in municipal, government, and large commercial projects, these contracts base payment on the actual quantity of materials installed, measured in tons, rather than a single lump-sum price. This calculator streamlines the complex process of forecasting and billing for such projects by integrating dimensional estimates with verifiable, real-world data. It serves a dual purpose: first, as a pre-project estimation tool to forecast material needs and potential revenue, and second, as a post-project billing tool to generate accurate invoices based on certified installed tonnage.
A key feature of the Asphalt Business Revenue Calculator is its intelligent logic that prioritizes actual data. While it can calculate an estimated tonnage based on the project's length, width, and thickness, it correctly defaults to the "Actual Tonnage Installed" input for revenue calculation if a value is provided. This aligns perfectly with the principles of unit price contracting, where the final payment is dictated by what is verifiably placed and compacted, as documented by scale tickets and delivery manifests. This prevents under-billing that can occur from subgrade variations or minor changes in project scope, ensuring contractors are compensated for every ton of material used.
Furthermore, the Asphalt Business Revenue Calculator incorporates essential financial details like unit pricing and discounts or retainage, providing a clear path from gross contractual value to the final net sales figure. This top-line revenue number is the foundational metric for all subsequent profitability analyses. For a deeper understanding of the contracting frameworks, resources from government bodies like the U.S. Department of Transportation provide context on infrastructure project financing, while Wikipedia's article on Unit Price Contracts offers a detailed definition and its applications. This tool helps contractors bridge the gap between operational execution and financial administration.
Ultimately, the Asphalt Business Revenue Calculator serves as a critical instrument for financial accuracy and project management. It empowers contractors to create reliable revenue forecasts, validate material usage against estimates, and generate precise, defensible invoices that maximize earned revenue. By providing a clear and logical breakdown of the calculation, the Asphalt Business Revenue Calculator removes guesswork, reduces administrative errors, and contributes directly to the financial health of the paving business.
Explore all remaining calculators in this Business & Profitability category.
Explore specialized calculators for your industry and use case.
In a unit price contract, you are paid for the exact amount of material you install, not for an estimate. Subgrade conditions or slight variations in thickness can cause the actual tonnage to differ from the estimate. Using the actual tonnage from scale tickets is essential for accurate, fair billing and to ensure you are fully compensated.
This is a standard industry conversion factor derived from the average density of compacted hot mix asphalt, which is about 148 lbs per cubic foot. The factor converts a volume (square feet × inches) directly into weight (short tons).
A discount is a permanent reduction in price. Retainage is a percentage of the payment (often 5-10%) that the client holds back until the project is fully completed and accepted. This calculator treats them the same mathematically (a percentage reduction), but you should know your contract terms. Retainage is typically invoiced for separately at the end of the project.
This is called an "overrun" and can happen due to an uneven subgrade requiring more material to achieve the specified thickness. In a unit price contract, you are entitled to bill for this extra tonnage. This calculator helps you compare the two, and a large overrun might warrant a discussion with the project owner or engineer.